trowbridge_pool_squash_facility
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
trowbridge_pool_squash_facility [2023/05/15 19:52] – [Trowbridge Pool/Squash Facility] bant07 | trowbridge_pool_squash_facility [2024/11/26 15:34] (current) – bant06 | ||
---|---|---|---|
Line 1: | Line 1: | ||
{{tag> | {{tag> | ||
====== Trowbridge Pool/Squash Facility ====== | ====== Trowbridge Pool/Squash Facility ====== | ||
- | The Trowbridge Pool/Squash Facility was built in 1929 and was the first project in what would later become the [[ferris_athletic_center|Ferris Athletic Center]]. The [[athletics|swimming]] pool was enclosed inside with four lanes, and the [[athletics|squash]] courts were built directly above the pool. The space was upgraded | + | [{{:: |
+ | |||
+ | The Trowbridge Pool/Squash Facility was built in 1929 and was the first project in what would later become the [[ferris_athletic_center|Ferris Athletic Center]]. The [[athletics|swimming]] pool was enclosed inside with four lanes, and the [[athletics|squash]] courts were built directly above the pool. | ||
+ | |||
+ | In 1925, Trinity College hired Samuel Breck Parkman Trowbridge, Class of 1883, to design a new campus master plan to succeed the [[summit_campus|design]] that had been created in the late nineteenth century by [[burges_william|William Burges]]. Trowbridge' | ||
+ | |drawing]] included the original design for the pool and squash courts, which were intended to become part of a larger gymnasium complex. Trowbridge' | ||
+ | |||
+ | By the 1990s, | ||
- | The pool was named in memory of Samuel Breck Parkman Trowbridge, Class of 1883. In 1925, the College hired Trowbridge to design a new campus master plan to succeed the Burges Plan. Trowbridge' | ||
---- | ---- | ||
trowbridge_pool_squash_facility.1684180343.txt.gz · Last modified: 2023/05/15 19:52 by bant07